-
2016
Metgün Group Entered the Energy Sector
-
2017
Konya SPP 13.94 MWp (Konya)
Kalecik HEPP 28.06 MWm (Artvin)
-
2018
Elbistan SPP 52.48 MWp (Kahramanmaraş)
-
2018
Metgün Energy Investments Inc. was Established
-
2020
Bioden Başmakçı BPP 8.21 MWm (Afyon)
Mersinli WPP 62.4 MWm (İzmir)
Fernas-4 SPP 34.96 MWp (Burdur)
-
2022
Bioden Hybrid SPP 0.59 MWp (Afyon)
Başmakçı Agricultural Trials (500 Decares of Dry Farming) (Afyon)
-
2023
Bioden Unlicensed SPP 2.84 MWp (Afyon)
Bioden Fertilizer Factory (Organomineral Fertilizer Production Capacity: 60,000 Tons/Year) (Afyon)
-
2024
Mersinli WPP Capacity Increase 11.8 MWm (İzmir)