KALECİK HEPP" (Hydroelectric Power Plant)

KALECİK HEPP" (Hydroelectric Power Plant)

Location

Center- Artvin

Installed Capacity

28,06

Annual Energy Production (MWh)

74.654,9

The Kalecik Hydroelectric Power Plant, located in Artvin and operated by Dağlar Energy Electric Production Inc., a subsidiary of Metgün Energy, was commissioned in 2017. The plant has 2 units of 14.030 MWm ANDRITZ HYDRO Pelton turbines and Indar generators, with a total installed capacity of 28.06 MWm and an annual production capacity of 81,720,000 kWh.

Project Name KALECİK HEPP" (Hydroelectric Power Plant)
Company Name Dağlar Energy Electric Production Inc.
Province/District of the Project Merkez- Artvin
Installed Capacity 28,06MWm/ 27,5MWe
Turbine  2x Vertical Pelton/Andritz Hydro
Feasibility Annual Energy Production (MWh) 81.720,0
Actual Annual Energy Production (MWh) 2018: 73.546,8
2019: 50.241,2
2020: 48.941,3
2021: 52.755,6
2022: 63.380,2
2023 :74.654,9
Commissioning Date 31.10.2017