MERSİNLİ WWP

MERSİNLİ WWP

Location

İzmir-Torbalı, Bayındır ve Kemalpaşa

Installed Capacity (MWm)

74,2 

Annual Energy Production (MWh)

192.500,0

The acceptance of all 13 NORDEX N133 4.8 MWm wind turbine generators (WTGs), with a total installed capacity of 62.4 MWm, at the Mersinli Wind Power Plant (WPP), located in İzmir and owned by Yander Electric Engineering Consultancy Construction Tourism and Trade Inc., a subsidiary of Metgün Energy, was completed in 2020.

As part of the capacity increase project for the Mersinli Wind Power Plant, two additional NORDEX N149/5.X turbines were installed. The ministerial acceptance procedures for these turbines, with a total capacity of 11.8 MWm, were completed on 3 October 2024, and the turbines were put into commercial operation. Accordingly, the total installed capacity of Mersinli WPP increased to 74.2 MWm.

The registration and verification process of Mersinli WPP under the Global Carbon Council voluntary carbon market framework is ongoing.

Project Name Mersinli WPP (Wind Power Plant)
Company Name Yander Electric Engineering Consultancy Construction Tourism and Trade Inc.
Province / District of the Project İzmir / Torbalı, Bayındır, and Kemalpaşa
Turbine - Generator Group 13 x (N133, 4.80 MWm / 4.23 MWe) + 2 x (N149, 5.90 MWm / 5.80 MWe)
Number of Turbines 13 + 2 = 15
Installed Capacity 74.20 MWm / 66.59 MWe
Feasibility Annual Energy Production (MWh) – 15 Turbines 192,500.0
Actual Annual Energy Production (MWh) 2020: 14,923.6
2021: 155,240.9
2022: 166,023.2
2023: 128,325.6
2024: 164,109.57
Commissioning Date 1 October 2020 – 30 December 2020