MERSİNLİ RES

MERSİNLİ RES

Location

İzmir-Torbalı, Bayındır ve Kemalpaşa

Installed Capacity (MWm)

74,2 

Annual Energy Production (MWh)

192.500,0

The acceptance of the units of the Mersinli Wind Power Plant, located in Izmir and operated under Yander Electric Engineering Consultancy Construction Tourism and Trade Inc., a subsidiary of Metgün Energy, was completed in 202013 adet NORDEX N133 4.8 MWm türbin ile toplamda 62,4 MWm kurulu güce sahiptir. 

With 13 NORDEX N133 4.8 MWm turbines, it has a total installed capacity of 62.4 MWm

As a result of the capacity increase applications for the Mersinli Wind Power Plant, 2 additional turbines (2 x 5.9 MWm) have been added, and the new installed capacity has been revised to 74.2 MWm and registered in the license. A total of 11.8 MWm will use 2 Nordex N149/5.X turbines, which are planned to be commissioned in 2024.

At the same time, the registration and verification process with the Global Carbon Council, a voluntary carbon market, is ongoing for the Mersinli Wind Power Plant.

Project Name Mersinli WPP" (Wind Power Plant)
Company Name Yander Electric Engineering Consultancy Construction Tourism and Trade Inc.
Province/District of the Project İzmir-Torbalı, Bayındır ve Kemalpaşa ilçeleri
Turbine - Generator Group 13 x (N133, 4.80 MWm / 4.23 MWe) + 2 x (N149, 5.9 MWm/5.8 MWe)
Number of Turbines 13 + 2 = 15 
Installed Capacity 74,20 MWm / 66,59MWe
Feasibility Annual Energy Production (MWh) – 15 Turbines 192.500,0
Actual Annual Energy Production (MWh) 2020: 14.923,6
2021: 155.240,9
2022: 166.023,2
2023 : 128.325,6
Commissioning Date 01.10.2020-30.12.2020